Skip to content

Categories:

SP

Projects
Syllabus
Lectures
SPC Report
Design Process
Measurable Milestones
Realistic Constraints   ASME Standards and Codes
Marketing assignment
Use of logbooks-ASEE Paper
Mini Business Plan
Conflict-workshop TKI Handout TKI Brief TKI_Int_Brief
Neotiation-workshop-handout
Trust-Workshop
Key to good presentation
System Engineering
System Engineering-Handout (Why Vasa sank?)      PPT
System Engineering Handout (return on execution)
 ASEE Paper- SP
FORMS
SP Proposal Form
Proposal Review Form
Preliminary Design Review Form
SP Final PresentationFeview Form
Group Activity Evaluation Form
Realistic contraints and Engineering Standards Form (pdf)
Realistic contraints and Engineering Standards Form (docx)
Safety Form
 SP Experience Survey

Website evaluation form

KEY DATES

Abstracts due (email to paliwal@tcnj.edu): 4/10/13

Draft Reports Due (to advisors): 4/24/13

Final Senior Project Presentations: 5/1/13

Celebration of Student Achievements: 5/1/2013

Poster Presentation Time Frame: 3-4 pm

 

Graded SP reports from advisors due (to me): 5/8/13

 

Final SP Presentation Structure:

Presentation Time for each team: 5 min per person + 10 min per team + 5 min questions/transition

For example, a team of four students will have- 5*4 + 10 + 5 = 35 min

Discipline specific presentations will be in the morning and interdisciplinary projects will be held in the afternoon (1-3 pm)

Senior Project Information and Forms